Draft document. Personally prepared by David Weekly; this is not a representation of the district or the Board of Trustees and may contain material factual errors. For official information, visit rcsdk8.net.
Leer en español
01

Overview

Grades
TK-8
Enrollment
High-need
Melissa Bowdoin
Principal
School typeNeighborhood
Address3790 Red Oak Way, Redwood City, CA 94061
Phone(650) 482-2414
School websiteroycloud.rcsdk8.net
GreatSchools9/10
02

Academic Performance

Student Growth

English growth
64%
2025-26 mid-year · District-wide: 60.7%
Math growth
59.4%
2025-26 mid-year · District-wide: 56.4%

CA State Testing (2023-24)

English Proficiency
District avg: 42%
Math Proficiency
District avg: 35%

Growth measures how much students are learning each year, regardless of their starting point. A school with low proficiency but high growth is accelerating learning. Proficiency measures how many students are at or above grade level right now.

Growth = % of students meeting their annual i-Ready Expected Growth target on the mid-year diagnostic. i-Ready is the district’s local K–8 literacy and math assessment; the LCAP goal is to raise this by 4 percentage points each year. Proficiency = % meeting or exceeding grade-level standards on the CAASPP (the California state test, given in spring of grades 3–8).

Sources: 2024-25 SARCs, 2025-26 SPSAs, 2025-26 LCAP, each school’s 2025-26 Board of Trustees data presentation. Proficiency from 2023-24 CAASPP. Growth from each school’s 2025-26 mid-year i-Ready diagnostic as reported to the Board.

03

Student Demographics

Socioeconomically Disadvantaged
Mostly students who qualify for free or low-cost school lunch
English Learners
Students still learning English
Suspension Rate
District avg: 2.2%
Students with IEPs
District avg: 17.6%
73.6%
District avg: 63%

Chronic Absenteeism by Subgroup

SubgroupRateAbsentEnrolled
All Students7.3%47644
Hispanic/Latino12.5%18144
White6.1%22362
Asian4%250
Two or More Races6.4%578
English Learners20%735
Students with Disabilities13.6%18132
Socioeconomically Disadvantaged16.3%17104

Chronic absenteeism rate by student subgroup. A student is chronically absent if they miss 10% or more of school days — about 18 days a year. Groups too small to report (fewer than 10 students) are not shown, to protect privacy. Source: California Dept. of Education, 2024-25.

English Learners: A Closer Look

In 2024-25, 33 of this school's 636 students (5%) were English Learners — students who are still learning English. Another 24 used to be English Learners and are now fluent: they passed the state's English test and were "reclassified" (RFEP).

Learning English
33
5% of the school
Long-Term (LTEL)
5
6+ years as an English Learner
At Risk of LTEL
2
4-5 years as an English Learner
Now Fluent (RFEP)
24
Tested out of English Learner status

A "long-term English Learner" (LTEL) is a student who has been learning English for 6 or more years without yet reaching fluency; students at 4-5 years are counted as "at risk" of becoming long-term. Schools watch these numbers because the goal is for students to reach fluency well before the 6-year mark.

Source: California Dept. of Education English Learner data (ELAS/LTEL), 2024-25 school year.

04

Funding

Total Per Pupil
$20,183 iSARC 2024-25
District: $19,391 + community: $792
Est. School Cost
$13.4M iSARC 2024-25
Restricted: $8,159 · Unrestricted: $11,232
Avg Teacher Salary
$100,170 iSARC 2024-25
District: $95,778
PTO/PTA Per Pupil
$792

Per-pupil expenditure data from the 2022-23 SARC. Restricted funds include Title I, special ed, and EL programs. Unrestricted funds are general operating. PTO/PTA revenue from IRS Form 990 filings.

Site Supplemental (SPSA) 2025-26

Supplemental (SPSA)
SPSA Per Pupil
$1,046 iSPSA 2025-26

SPSA Source Breakdown

District: $292K PTO/PTA: $215K Measure U: $117K Prop 28: $71K
Source Amount % of Total
District $292K 42%
PTO/PTA $215K 31%
Measure U $117K 17%
Prop 28 $71K 10%
Total $695K 100%

This school does not receive Title I federal funding.

SPSA budgets represent supplemental site-level spending (enrichment, counseling, PD, materials). Base operating costs (teacher salaries, admin, facilities) come from the general fund and vary by school.

05

Who Teaches Here

Roy Cloud School has 36 teachers for 636 students — about 19 students per teacher. On average, its teachers have been teaching for 14.6 years, and 7 of the 36 are in their first or second year.

Teachers
36
Students per Teacher
18.9:1
District avg: 21:1
Avg Years Teaching
14.6
13.2 years in RCSD
New Teachers
7 / 36
In their 1st or 2nd year of teaching
Students per Counselor
636:1
Counselors, psychologists, social workers & nurses

Source: California Dept. of Education staffing data, 2024-25 school year.

Credentials

Fully Credentialed
District avg: 75%
Misassigned

"Misassigned" means a teacher was placed in a class they are not credentialed for — most often classes with students learning English (EL). District target: 100% by 2027.

Teacher demographics highlights

Hispanic staff13.5%
White staff70.3%
Staff over 5529.7%

Students learning English — including long-term English Learners — are rated RED (the lowest level) on the California Dashboard, the state's school report card, despite strong overall scores. Runs a $33K "Literature Lift" program to bring more diverse books into classrooms. Has a student LGBTQ+ club, Rainbow Cloud. Hispanic teachers grew from 9% to 13.5% of staff over 4 years.

Teacher Race & Ethnicity

Race/EthnicityTeachers%Share
Hispanic/Latino513.9%
White2775.0%
Asian38.3%
Filipino12.8%
Total36100%

Counts classroom teachers only. Source: California Dept. of Education staff data, 2024-25 school year.

06

Documents & Resources

School Accountability Report Card (SARC)

A yearly report card the state requires from every school: test scores, class sizes, teacher credentials, and campus conditions in one PDF.

Download SARC (PDF) ↗

School Plan for Student Achievement (SPSA)

The school’s yearly plan for how it spends its extra (“supplemental”) money — tutoring, counselors, materials, and more.

Download SPSA (PDF) ↗

Board Presentation

2025-26 · April 1, 2026

View presentation (PDF) ↗

Bell Schedule

Supervision starts: 8:00 AM

Grade RegularMon · Tue · Wed · Fri Thursday Super-min
TK 8:15 AM1:30 PM 12:50 PM 11:45 AM
K 8:15 AM1:45 PM 12:50 PM 11:45 AM
1-3 8:15 AM2:25 PM 12:50 PM 11:45 AM
4-8 8:15 AM2:50 PM 12:50 PM 11:45 AM

Lunch Menu

View menu ↗

Report an Absence

SchoolMessenger

iOS ↗ · Android ↗

Comprehensive Safety Plan

2025-26 plan, board-approved Feb 4, 2026.

Download CSSP (PDF) ↗

School Site Council

Chair: Keeley Vega

SPSA adopted: April 29, 2025

Principal: Melissa Bowdoin
Teacher: Anna Rivoli, Linda Kiefer, Joan Perez
Staff: Annette Bacab
Parent / Community: Courtney Borrone, Keeley Vega, Zane Rogers, Harmony Younes

View SPSA ↗

07

Board Meetings

Board of Trustees meetings with agenda items mentioning this school.

June 17, 2026

Regular Full meeting →
Approval of Contracts with Quattrocchi Kwok Architects (QKA) for Design Services for HVAC Upgrades Project, Phase 3 at Henry Ford and Roy Cloud
Redwood City SD-Quattrocchi - Exhibits B thru I - Roy Cloud & Henry Ford (06.09.2026)(4611973.1) ↗Redwood City SD-Quattrocchi - Exhibit A - Roy Cloud & Henry Ford (06.09.2026)(4612032.1) ↗Redwood City SD-Quattrocchi - Architect Agreement - Roy Cloud & Henry Ford (06.09.2026)(4612053.1) ↗
Approval of Proposal for Landscape Architectural Services with Carducci Associates Related to the Roy Cloud School Solar Phase 2 Project
260617 RCSD Architectural Services Proposal Related to the Roy Cloud Solar Project-Revised ↗

May 13, 2026

Regular Full meeting →
Approval of Agreement between the Redwood City School District and PowerFlex for the Purchase of 8 EV Chargers for Hoover Community School and Roy Cloud School
▶ Watch
260513 RCSD Technology Purchase Agreement with Powerflex for Hoover and Roy Cloud ↗

April 22, 2026

Regular Full meeting →
Approval of HVAC Upgrades Projects Phase 3: Henry Ford and Roy Cloud Schools
▶ Watch

April 1, 2026

Regular Full meeting →
Roy Cloud School Presentation and School Plan for Student Achievement (SPSA) Approval
▶ Watch
Roy cloud 25-26 Data for Board presentation (1) ↗Roy Cloud 2025-26_SPSA_(Spring)_Roy_Cloud_Elementary_School_20260323 ↗

March 25, 2026

Regular Full meeting →
Approval of Roy Cloud's Field Trip to Washington DC – May 18 - May 22, 2026
▶ Watch
25-26 Roy Cloud. Washington DC ↗
Approval of Roy Cloud School Field Trip to Elks Club – June 1, 2026
▶ Watch
25-26 Roy Cloud. Elks Club ↗

March 11, 2026

Regular Full meeting →
Field trip to Marine Science Institute
▶ Watch
25-26 RoyCloud. MSI. FT ↗

February 4, 2026

Regular Full meeting →
Approval of Overtime Allowance, Change Order #4 for Solar Phase 2 Project at Roy Cloud School with Holt Renewables
▶ Watch
260204 RCSD Roy Cloud CO#4 - OT Allowance ↗
Approval of the Addendum to the Measure U Application for Roy Cloud for the 2025-2026 School Year
▶ Watch
2025-26 Roy Cloud School Measure U Addendum_Signed ↗

November 12, 2025

Regular Full meeting →
Approval of Amendment No. 1 between Redwood City School District and One Life Counseling for Additional Counseling Hours at Roy Cloud and Henry Ford for the 2025-2026 School Year
▶ Watch
One Life 2025 ↗One Life First Amendment ↗

September 10, 2025

Regular Full meeting →
Approval of Roy Cloud School Field Trip to Golden Gate National Recreation Area – October 6, 2025 – October 10, 2025
▶ Watch
25-26 Roy Cloud. Outdoor Ed ↗

August 19, 2025

Regular Full meeting →
Approval of Roy Cloud School Field Trip to Golden Gate National Recreation Area (GGNRA) – October 1, 2025 – October 3, 2025
▶ Watch
24-25 Roy Cloud. Golden Gate Rec Area ↗

May 28, 2025

Board Meeting Full meeting →
School Plan for Student Achievement (SPSA review)
▶ Watch
Hoover SPSA 2025-26_Spring)__20250518.pdf ↗Kennedy SPSA 2025-26_(Spring)__20250519.pdf ↗MCKinley Middle School SPSA ↗North Star Academy 2025-26_SPSA(Spring)__20250514.pdf ↗Roy Cloud SPSA 2025-26_20250514.pdf ↗

May 14, 2025

Board Meeting Full meeting →
HVAC replacement for multi-use building
▶ Watch
Proposal MUB RTU #1 Replacement 12-2024 Revised 5-2025 (1).pdf ↗Proposal MUB RTU #2 Replacement 12-2024 Revised 5-2025 (1).pdf ↗

February 26, 2025

Board Meeting Full meeting →
Measure U funding addendum
▶ Watch
2024-25 Roy Cloud Measure U ADDENDUM [Pending Board Approval].pdf ↗

February 5, 2025

Board Meeting Full meeting →
School presented its 2024-25 academic year report to the board.
▶ Watch
Hoover 24-25 Data for Board presentation.pdf ↗Roy cloud 24-25 Data for Board presentation.pdf ↗

April 3, 2024

Board Meeting Full meeting →
Board updated Measure U spending plan.
▶ Watch
ROY CLOUD Measure U Addendum No. 1.pdf ↗

October 25, 2023

Board Meeting Full meeting →
Adelante Selby and Roy Cloud School Presentations for the 2023-2024 School Year
▶ Watch
Adelante Selby Spanish Immersion School Board Presentation.pdf ↗23-24 Roy Cloud SPSA Board Report.pdf ↗

March 22, 2023

Board Meeting Full meeting →
Discussion of School Plan for Student Achievement (SPSA): Roy Cloud School and North Star Academy
▶ Watch
Roy Cloud SPSA Board Report.pdf ↗North Star SPSA Board Report .pdf ↗
Approval of Addendum to 2022-23 Measure U Application for Roy Cloud School
▶ Watch
ADDENDUM Roy Cloud Measure U 2022-23.pdf ↗

June 29, 2022

Board Meeting Full meeting →
Approval of Agreement between Legarza Sports and the Redwood City School District for PE Enrichment Program at Roy Cloud School for the 2022-23 School Year
▶ Watch
Legarza _ Cloud 22.23 _ Board 6.29.22.pdf ↗

April 13, 2022

Board Meeting Full meeting →
Approval of Addendum to Measure U Application for 2021-22 School Year for Roy Cloud School
▶ Watch
ADDENDUM Roy Cloud Measure U 2021-22.pdf ↗

January 19, 2022

Board Meeting Full meeting →
Approval of Fiber Upgrades Proposal at 3150 Granger Way Site and Roy Cloud School with Vanden Bos
▶ Watch
211215 RCSD ADL & RC Fiber Upgrade Proposal with VDB - Signed by DD.pdf ↗

August 11, 2021

Board Meeting Full meeting →
Approval of Agreement between the Redwood City School District and LeGarza Sports to Provide PE Instruction, Recess and Lunch Time Supervision for Grades K-5 at Roy Cloud School
▶ Watch
Legarza Agreement Cloud_21.22.pdf ↗

June 16, 2021

Board Meeting Full meeting →
Approval of Multi-Use Building (MUB) Backup Generator Construction Agreements for Roy Cloud School with Various Trade Contractors
10_8_BackupGeneratorConcreteConstructionAgreementWithCaseyFogli_0.pdf ↗10_8_BackupGeneratorElectricalConstructionAgreementWithAtlasPellizzari_0.pd ↗10_8_BackupGeneratorPlumbingConstructionAgreementWithOCMcDonald_0.pdf ↗

May 19, 2021

Board Meeting Full meeting →
Approval of Modernization and Barrier Removal Project for Roy Cloud School with Mar Con Builders, Change Order #5
▶ Watch
11_2_ChangeOrder5_0.pdf ↗
Approval of Backup Generator Purchase Proposal for Clifford, Hoover, and Roy Cloud School with Bayside
▶ Watch
11_7_GeneratorPurchaseProposalClifford_0.pdf ↗11_7_GeneratorPurchaseProposalHoover_0.pdf ↗11_7_GeneratorPurchaseProposalRoyCloud_0.pdf ↗

April 14, 2021

Board Meeting Full meeting →
Roy Cloud School's Social Emotional Learning Program during the 2020-21 School Year
▶ Watch
9_1_PresentationFromRoyCloud_0.pdf ↗

March 24, 2021

Board Meeting Full meeting →
Approval of Roy Cloud School Modernization and Barrier Removal Project, Change Order #4 with Mar Con Builders
▶ Watch
7_1_ChangeOrder4_0.pdf ↗
Approval of Second Addendum to 2020-21 Measure U Application for Roy Cloud School
▶ Watch
10_4_2ndAddendumTo202021MeasureUApplication_0.pdf ↗

March 10, 2021

Board Meeting Full meeting →
Approval of Roy Cloud School Modernization and Barrier Removal Project with Mar Con Builders, Change Order #3
▶ Watch
10_7_ChangeOrder3_0 (1).pdf ↗

February 24, 2021

Board Meeting Full meeting →
Approval of Sink Rental Proposal for Roy Cloud School with United
▶ Watch
10_2_SinkRentalProposalWithUnited_0.pdf ↗
Approval of Addendum to 2020-21 Measure U Application for Roy Cloud School
▶ Watch
13_5_MeasureUAddendumForRoyCloud_0.pdf ↗

January 27, 2021

Board Meeting Full meeting →
Approval of Additional Construction Management Services Fee Proposal for Roosevelt School, Roy Cloud School, and Adelante Selby School with Kitchell
▶ Watch
10_4_AddServiceProposal_0.pdf ↗
Approval of Roy Cloud School Modernization and Barrier Removal Project with Mar Con Builders, Change Order #2
▶ Watch
10_5_ChangeOrder2_0.pdf ↗

December 9, 2020

Board Meeting Full meeting →
Approval of Touchless Plumbing Fixture Replacement Construction Management (CM) Fee Proposal for Adelante Selby Spanish Immersion School, McKinley Institute of Technology, North Star Academy, and Roy Cloud School with Kitchell
▶ Watch
Touchless Plumbing Fixture Replacement CM Fee Proposal.pdf ↗

November 18, 2020

Board Meeting Full meeting →
Approval of Roy Cloud School Modernization and Barrier Removal Project with Mar Con Builders, Change Order #1
▶ Watch
10_12_ChangeOrder1_0.pdf ↗
Approval of Backup Power Design Agreement for Multi-Use Buildings (MUB) at Clifford and Roy Cloud Schools and Food Storage at Hoover School with HED
▶ Watch
10_20_MasterArchitectAgreement_0.pdf ↗

November 4, 2020

Board Meeting Full meeting →
Approval of Toilet Partition Proposal for Roy Cloud School with Service Metal
▶ Watch
9_7_ToiletPartitionProposalWithServiceMetal_0.pdf ↗

September 23, 2020

Board Meeting Full meeting →
Approval of Touchless Plumbing Fixture Replacement Proposals for Orion Alternative School (Formerly John Gill School) and Roy Cloud School with CAW
▶ Watch
10_5_TouchlessPlumbingFixtureReplacementProposalRoyCloudSchool_0.pdf ↗10_5_TouchlessPlumbingFixtureReplacementsProposalOrionAlternative_0.pdf ↗

August 26, 2020

Board Meeting Full meeting →
Approval of Construction Agreement for Roy Cloud School with Mar Con Builders
▶ Watch
7_1_ConstructionAgreementWithMarCon_0.pdf ↗

July 29, 2020

Special Meeting Full meeting →
Approval of Additional Legacy Closeout Support Proposal for Roy Cloud School with WLC
▶ Watch
6_14_AdditionalServicesAuthorization_0.pdf ↗

June 24, 2020

Board Meeting Full meeting →
Approval of the Covid-19 Safety Compliance Officer Proposal for Clifford School, Garfield School, Roy Cloud School, and Roosevelt School with The Safety Guys
▶ Watch
10_10_SCOProposal_0.pdf ↗
Approval of Construction Management Fee Amendments for Adelante Selby Spanish Immersion School, Hawes School, Roosevelt School, and Roy Cloud School with Kitchell
▶ Watch
10_11_ConstructionManagementFeeAmendmentAdelanteSelby_0.pdf ↗10_11_ConstructionManagementFeeAmendmentHawes_0.pdf ↗10_11_ConstructionManagementFeeAmendmentRoosevelt_0.pdf ↗10_11_ConstructionManagementFeeAmendmentRoyCloud_0.pdf ↗