Draft document. Personally prepared by David Weekly; this is not a representation of the district or the Board of Trustees and may contain material factual errors. For official information, visit rcsdk8.net.
Leer en español
01

Overview

Enrollment
High-need
David Camarena
Principal
School typeNeighborhood
Community SchoolYes
Address903 10th Avenue, Redwood City, CA 94063
Phone(650) 482-2416
School websitetaft.rcsdk8.net
GreatSchools4/10
02

Academic Performance

Student Growth

English growth
65.4%
2025-26 mid-year · District-wide: 60.7%
Math growth
61.2%
2025-26 mid-year · District-wide: 56.4%

CA State Testing (2023-24)

English Proficiency
District avg: 42%
Math Proficiency
District avg: 35%

Growth measures how much students are learning each year, regardless of their starting point. A school with low proficiency but high growth is accelerating learning. Proficiency measures how many students are at or above grade level right now.

Growth = % of students meeting their annual i-Ready Expected Growth target on the mid-year diagnostic. i-Ready is the district’s local K–8 literacy and math assessment; the LCAP goal is to raise this by 4 percentage points each year. Proficiency = % meeting or exceeding grade-level standards on the CAASPP (the California state test, given in spring of grades 3–8).

Sources: 2024-25 SARCs, 2025-26 SPSAs, 2025-26 LCAP, each school’s 2025-26 Board of Trustees data presentation. Proficiency from 2023-24 CAASPP. Growth from each school’s 2025-26 mid-year i-Ready diagnostic as reported to the Board.

03

Student Demographics

Socioeconomically Disadvantaged
Mostly students who qualify for free or low-cost school lunch
English Learners
Students still learning English
Suspension Rate
District avg: 2.2%
Students with IEPs
District avg: 17.6%
46.9%
District avg: 63%

Chronic Absenteeism by Subgroup

SubgroupRateAbsentEnrolled
All Students26.4%101382
Hispanic/Latino26%94361
English Learners26.3%67255
Students with Disabilities36.9%38103
Socioeconomically Disadvantaged25.9%94363
Homeless29.3%2275

Chronic absenteeism rate by student subgroup. A student is chronically absent if they miss 10% or more of school days — about 18 days a year. Groups too small to report (fewer than 10 students) are not shown, to protect privacy. Source: California Dept. of Education, 2024-25.

English Learners: A Closer Look

In 2024-25, 235 of this school's 357 students (66%) were English Learners — students who are still learning English. Another 21 used to be English Learners and are now fluent: they passed the state's English test and were "reclassified" (RFEP).

Learning English
235
66% of the school
Long-Term (LTEL)
0
6+ years as an English Learner
At Risk of LTEL
62
4-5 years as an English Learner
Now Fluent (RFEP)
21
Tested out of English Learner status

A "long-term English Learner" (LTEL) is a student who has been learning English for 6 or more years without yet reaching fluency; students at 4-5 years are counted as "at risk" of becoming long-term. Schools watch these numbers because the goal is for students to reach fluency well before the 6-year mark. California only starts counting students as long-term English Learners in grade 6, so elementary schools always show zero.

Source: California Dept. of Education English Learner data (ELAS/LTEL), 2024-25 school year.

04

Funding

Total Per Pupil
$23,625 iSARC 2024-25
District: $23,625
Est. School Cost
Restricted: $10,366 · Unrestricted: $13,259
Avg Teacher Salary
$99,829 iSARC 2024-25
District: $95,778
PTO/PTA Per Pupil
Supported by RCEF

Per-pupil expenditure data from the 2022-23 SARC. Restricted funds include Title I, special ed, and EL programs. Unrestricted funds are general operating. PTO/PTA revenue from IRS Form 990 filings.

Site Supplemental (SPSA) 2025-26

Supplemental (SPSA)
SPSA Per Pupil

SPSA Source Breakdown

Title I: $69K Measure U: $97K Prop 28: $72K
Source Amount % of Total
Title I $69K 29%
Measure U $97K 41%
Prop 28 $72K 30%
Total $238K 100%

This school receives Title I federal funding.

SPSA budgets represent supplemental site-level spending (enrichment, counseling, PD, materials). Base operating costs (teacher salaries, admin, facilities) come from the general fund and vary by school.

05

Who Teaches Here

Taft School has 17 teachers for 357 students — about 21 students per teacher. On average, its teachers have been teaching for 13.6 years, and 2 of the 17 are in their first or second year.

Teachers
17
Students per Teacher
21:1
District avg: 21:1
Avg Years Teaching
13.6
9.8 years in RCSD
New Teachers
2 / 17
In their 1st or 2nd year of teaching
Students per Counselor
217.7:1
Counselors, psychologists, social workers & nurses

Source: California Dept. of Education staffing data, 2024-25 school year.

Credentials

Fully Credentialed
District avg: 75%
Misassigned
EL Misassigned

"Misassigned" means a teacher was placed in a class they are not credentialed for — most often classes with students learning English (EL). District target: 100% by 2027.

Teacher demographics highlights

Hispanic staff29.2%
Staff under 3541.7%

#1 in the district for math growth (27.6%), #3 for reading growth. Youngest staff in the district alongside Hoover (41.7% under 35). Smallest supplemental (SPSA) budget ($238K). Came off the state's extra-support list (ATSI) in 2024-25. 7% of students are experiencing homelessness.

Teacher Race & Ethnicity

Race/EthnicityTeachers%Share
Hispanic/Latino423.5%
White1164.7%
Filipino211.8%
Total17100%

Counts classroom teachers only. Source: California Dept. of Education staff data, 2024-25 school year.

06

Documents & Resources

School Accountability Report Card (SARC)

A yearly report card the state requires from every school: test scores, class sizes, teacher credentials, and campus conditions in one PDF.

Download SARC (PDF) ↗

School Plan for Student Achievement (SPSA)

The school’s yearly plan for how it spends its extra (“supplemental”) money — tutoring, counselors, materials, and more.

Download SPSA (PDF) ↗

Board Presentation

2025-26 · March 25, 2026

View presentation (PDF) ↗

Bell Schedule

Grade RegularMon · Tue · Wed · Fri Thursday
TK 8:30 AM1:30 PM 1:00 PM
K 8:20 AM2:00 PM 1:10 PM
1 8:20 AM2:25 PM 1:20 PM
2 8:20 AM2:30 PM 1:25 PM
3-5 8:15 AM2:45 PM 1:35 PM

Lunch Menu

View menu ↗

Parent Communication

ParentSquare (district-wide) ↗

Report an Absence

SchoolMessenger

iOS ↗ · Android ↗

Comprehensive Safety Plan

2025-26 plan, board-approved Feb 4, 2026.

Download CSSP (PDF) ↗

School Site Council

Chair: Rick Soriano

SPSA adopted: March 31, 2025

Principal: David Camarena
Teacher: Melissa Lopez, Ian Milos
Staff: Jocelyne Arriaga, Jennifer C Torres
Parent / Community: Rick Soriano, Blanca Madrigal, Fabiola Kerfoot, Jade Martinez, Florence Ortiz

View SPSA ↗

07

Board Meetings

Board of Trustees meetings with agenda items mentioning this school.

March 25, 2026

Regular Full meeting →
Approval of Steel Casing Cost, Change Order #3 for Solar Phase 2 Project at Taft Community School with Holt Renewables (Measure T)
▶ Watch
260325 RCSD Steel Casing Cost Change Order #3 for Taft Community School ↗
Taft School Presentation and School Plan for Student Achievement (SPSA) Approval
▶ Watch
Taft 25-26 Board Presentation ↗Taft SPSA 2025-26_(Spring)Elementary_School_20260315 ↗

January 14, 2026

Regular Full meeting →
Approval of the Addendum to the Measure U Application for Taft Community School for the 2025-2026 School Year
▶ Watch
2025-26 Taft Measure U Addendum Signed ↗

December 10, 2025

Regular Full meeting →
Approval of the Addendum to the Measure U Application for Taft Community School for the 2025-2026 School Year
▶ Watch
2025-26 Taft Measure U Addendum Signed ↗

August 27, 2025

Regular Full meeting →
Approval of the Industrial Hygienist Services agreements with ProTech Consulting & Engineering for the HVAC Upgrade projects at Taft, Roosevelt, Hoover, Adelante Selby, and campuses with temporary AC units.
▶ Watch
ProTech Contract (HVAC) Temp AC Units ↗ProTech Contract (HVAC) Taft ↗ProTech Contract (HVAC) Roosevelt ↗ProTech Contract (HVAC) Hoover ↗ProTech Contract (HVAC) Adelante Selby ↗

June 25, 2025

Regular Full meeting →
Approval of the Agreements for Special Inspection and Testing Services with Applied Materials and Engineering for the HVAC Upgrade projects at Taft, Roosevelt, Hoover, and Adelante Selby
▶ Watch
Adelante Selby Special Inspection & Testing Agreement ↗Hoover Special Inspection & Testing Agreement ↗Roosevelt Special Inspection & Testing Agreement ↗Taft Special Inspection & Testing Agreement ↗
Approval of the Agreements for Commissioning Services with Cypress Engineering Group for the HVAC Upgrade projects at Taft, Roosevelt, Hoover, and Adelante Selby
▶ Watch
Adelante Selby CX Agreement-signed ↗Hoover CX Agreement-signed ↗Roosevelt CX Agreement-signed ↗Taft CX Agreement-signed ↗

June 11, 2025

Regular Full meeting →
Approval of Siemens Building Management System for Mechanical Controls at Hoover, Taft, Roosevelt, and Adelante Selby
▶ Watch
7.2 RCSD Mech Replacements Proposal Siemens ↗

May 14, 2025

Board Meeting Full meeting →
Lease-leaseback construction agreement for HVAC project
▶ Watch
Resolution 24 LLB Award(4283830.1).pdf ↗UPDATED 1.2 - Site Lease -RCSD - HVAC Upgrades Projects (DWK clean 5.12.2025)(4400783.1).pdf ↗UPDATED 1.3 - Facilities Lease - RCSD HVAC Upgrades Projects (DWK clean 05.12.2025)(4400785.1).pdf ↗1.4 - Facilities Lease Ex C - RCSD HVAC Upgrades Projects (DWK rev 05.06.2025)(4397961.1).pdf ↗1.5 - Facilites Lease Ex D - RCSD HVAC Upgrades Projects (DWK rev 05.06.2025)(4397930.1).pdf ↗UPDATED 1.6 - Facilities Lease Ex D-1 - RCSD HVAC Upgrades Projects (DWK clean 05.12.2025)(4400781.1).pdf ↗1.7 - LLB Contract Documents - RCSD HVAC Upgrades Projects (DWK rev 05.06.2025)(4397886.1).pdf ↗
New English/Spanish language arts curriculum pilot for 2025-26
▶ Watch
79726 Pilot2025Taft-Garfield 4-17-2025 v2 (1).pdf ↗

April 16, 2025

Board Meeting Full meeting →
School Plan for Student Achievement (SPSA review)
▶ Watch
Orion 2025-26_SPSA_(Spring)__20250403.pdf ↗Taft 2025-26_SPSA (Sprin)_20250403.pdf ↗25-26 Garfield _SPSA_(Spring) 20250416 (Updated 4.16.25).pdf ↗25-26 Henry Ford _SPSA_(Spring) 20250416 (Updated 4.16.25).pdf ↗SPSA Updates.HF.Garfield.Orion.Taft 20250416.pdf ↗

January 8, 2025

Board Meeting Full meeting →
School presented its 2024-25 academic year report to the board.
▶ Watch
Taft 24-25 Data for Board presentation.pdf ↗Adelante Selby 24-25 Data for Board presentation (1).pdf ↗

November 20, 2024

Board Meeting Full meeting →
Board updated Measure U spending plan.
▶ Watch
2024-25 Taft Measure U Addendum.pdf ↗

November 6, 2024

Board Meeting Full meeting →
Board design services contract for HVAC upgrades.
▶ Watch
Architect Agreement Taft HVAC.pdf ↗Architect Agreement Roosevelt HVAC.pdf ↗Architect Agreement Hoover HVAC.pdf ↗Architect Agreement Adelante Selby HVAC.pdf ↗7.3 Overview.pdf ↗

June 26, 2024

Board Meeting Full meeting →
Board release of Measure U funds for 2024-25.
▶ Watch
2024-25 Taft Measure U Application.pdf ↗

April 17, 2024

Board Meeting Full meeting →
Board updated Measure U spending plan.
▶ Watch
23-24 TAFT MEASURE U ADDENDUM.pdf ↗

January 10, 2024

Board Meeting Full meeting →
Orion and Taft School Presentations for the 2023-2024 School Year
▶ Watch
Orion Board Report 2023-2024.pdf ↗Taft Board Report 23-24.pdf ↗

October 11, 2023

Board Meeting Full meeting →
Approval of Proposal and Change Order #1 for Irrigation Upgrades with Scapes for Taft Community School
▶ Watch
230914 Taft Parking Lot Irrigation Adjustments Proposal with Scapes - Signed by MC.pdf ↗231002 Taft Irrigation Upgrades Change Order #1 with Scapes - Signed by MC.pdf ↗

June 28, 2023

Board Meeting Full meeting →
Approval of Proposal for Outdoor Classroom Landscape Construction with Mike McCall Landscape, Inc. for Taft Community School
▶ Watch
230628 - Taft Outdoor Classroom Landscape Proposal with Mike McCall - Signed by MC.pdf ↗
Approval of Proposals for New Sod and Maintenance with Scapes at Garfield and Taft Community Schools
▶ Watch
230620 Garfield New Sod Proposal with Scapes - Signed by MC.pdf ↗230620 Taft New Sod Proposal with Scapes - Signed by MC.pdf ↗
Approval of Construction Management Services Amendment #4 with RGMK for Taft Community School
▶ Watch
230620 Taft CM Fee Amendment #4 with RGMK - Signed by RK.pdf ↗

June 14, 2023

Board Meeting Full meeting →
Approval of Proposal for Outdoor Classroom Fencing and Gate with Dryco for Taft Community School
▶ Watch
230614 Taft Outdoor Classroom Fencing and Gate Proposal with Dryco - Signed by MC.pdf ↗
Approval of Final Plan Review Invoice with the Division of the State Architect (DSA) for Taft Community School
▶ Watch
01-117949_Invoice 01-13404_2023-05-24.pdf ↗

March 8, 2023

Board Meeting Full meeting →
Addendum to 2022-23 Measure U Application for Taft Community School
▶ Watch
Taft Measure U Addendum 2022-23.pdf ↗

February 15, 2023

Board Meeting Full meeting →
Single Plan for Student Achievement for Orion, Garfield, and Taft Community Schools
▶ Watch
Orion SPSA Board Report .pdf ↗Garfield SPSA Board Report.pdf ↗Taft SPSA Board Report (1).pdf ↗

November 16, 2022

Board Meeting Full meeting →
Approval of Addendum to 2022-23 Measure U Application for Taft Community School
▶ Watch
Taft Addendum Measure U 2022-23.pdf ↗

November 9, 2022

Board Meeting Full meeting →
Approval of New Buildings, Modernization and Sitework, Bid Package G, Change Order #27 to the Agreement with Beals Martin for Taft Community School
▶ Watch
221109 RCSD TA Bid Package G CO No. 27 Package.pdf ↗

August 24, 2022

Board Meeting Full meeting →
Approval of Proposal for the Installation of Markerboards, Tackboards, and Hook Systems with Beals Martin at Taft Community School
▶ Watch
Proposal for Beals Martin.pdf ↗
Approval of New Building, Modernization and Sitework Project Bid Package G, Change Order #25 to the Agreement with Beals Martin for Taft Community School
▶ Watch
220824 RCSD TA Bid Package G CO No. 25 Package.pdf ↗
Adoption of Futility Resolution 6, Approval of New Building, Modernization and Sitework Plumbing Project, Change Order #2 with Dinelli Plumbing at Taft Community School
▶ Watch
220824 RCSD TA Bid Package H CO No. 2 Package.pdf ↗220824 Taft Change Order Futility Resolution #6 with Dinelli.pdf ↗

August 10, 2022

Board Meeting Full meeting →
Approval of Proposal for Rock Removal on the Temporary Parking Lot with Duran & Venables at Taft Community School
▶ Watch
220711 Taft Temp Lot Rock Removal Proposal with D&V - Signed by DD.pdf ↗
Approval of Proposal for Clearing and Grubbing, Installation of an Irrigation and Automatic Watering System and Hydroseed Control with Scapes, Inc. at Taft Community School
▶ Watch
220729 Taft Temp Lot Seed and Garden Demo Proposal with Scapes - Signed by DD.pdf ↗
Approval of Proposal for Asphalt Seal and Striping with Dryco at Taft Community School
▶ Watch
220711 Taft Asphalt Seal and Stripe Proposal with Dryco - Signed by DD.pdf ↗

June 29, 2022

Board Meeting Full meeting →
Approval of Flooring Abatement Proposal for Taft Community School with ATI
▶ Watch
220610 Taft Flooring Abatement Proposal with ATI - Signed by DD.pdf ↗
Approval of Flooring Proposal for Taft Community School with Beals Martin
▶ Watch
220609 Taft Flooring Proposal with Beals Martin - Signed by DD.pdf ↗

June 15, 2022

Board Meeting Full meeting →
Approval of New Buildings, Modernization and Sitework Project Bid, Package J, Change Order #4 for Taft Community School with PARC Environmental
▶ Watch
220606 RCSD TA Bid Package J CO No. 4 Cover Sheet - Frontload Packet.pdf ↗

May 25, 2022

Board Meeting Full meeting →
Approval of New Buildings, Modernization and Sitework Project Bid, Package A, Change Order #8 for Taft Community School with Atlas/Pellizzari Electric
▶ Watch
220525 RCSD TA Bid Package D CO No. 8 Cover Sheet - Frontload Packet.pdf ↗

May 11, 2022

Board Meeting Full meeting →
Approval of New Buildings, Modernization and Site-work Project Bid Package C, Change Order #4 for Taft Community School with Dryco
▶ Watch
220504 RCSD TA Bid Package C CO No. 4 Front Load Package.pdf ↗

April 27, 2022

Board Meeting Full meeting →
Approval of Tree Replacement Proposal for Taft Community School with Davey Tree
▶ Watch
220401 Taft Tree Replacement Proposal with Davey - Signed by DD.pdf ↗
Approval of Taft Community School New Buildings, Modernization & Sitework Project Bid Package A with Duran & Venables, Change Order #4
▶ Watch
220413 RCSD TA Bid Package A CO No. 4 Cover Sheet - Frontload Packet($32,176.13).pdf ↗
Approval of Electric Vehicle (EV) Charger Installation Proposal for Taft Community School with Atlas
▶ Watch
220329 Taft EV Chargers Proposal with Atlas - Signed by DD.pdf ↗

April 13, 2022

Board Meeting Full meeting →
Approval of Project Inspector Agreement Amendment #11 for Orion Alternative (Formerly John Gill) and Taft Community School with Inspectacon
▶ Watch
220405 RCSD Project Inspector Amendment #11 with Inspectacon.pdf ↗

March 9, 2022

Board Meeting Full meeting →
Approval of Special Testing and Inspection Project Authorization Form #18.3 at Taft Community School with Ninyo and Moore
▶ Watch
220216 Taft Phase 1 Special Inspection Agreement PAF 18-3 - Fully Executed.pdf ↗

February 16, 2022

Board Meeting Full meeting →
Approval of Furniture Moving Services Proposal at Taft Community School with Rentacrate
▶ Watch
220204 Taft Moving Services Proposal with Rentacrate - Signed by DD.pdf ↗

January 12, 2022

Board Meeting Full meeting →
Approval of Addendum to 2021-22 Measure U Application for Taft Community School
▶ Watch
TAFT Measure U Addendum 2021-22.pdf ↗

December 15, 2021

Board Meeting Full meeting →
Approval of Architect Additional Services Proposals for Garfield, Kennedy, and Taft Schools with HED
▶ Watch
211202 Kennedy Maker Space Misc Services Proposal with HED - Signed by DD.pdf ↗211202 Garfield Off-Site Coordination Proposal with HED - Signed by DD.pdf ↗211202 Garfield Additional CA Proposal with HED - Signed by DD.pdf ↗211202 Taft Additional CA Proposal with HED - Signed by DD.pdf ↗

November 17, 2021

Board Meeting Full meeting →
Approval of Project Inspector Agreement Amendment #10 for Orion Alternative (Formerly John Gill) and Taft Schools with Inspectacon
▶ Watch
211109 RCSD Project Inspector Amendment #10 with Inspectacon.pdf ↗

November 10, 2021

Board Meeting Full meeting →
Electives Offered by PAL to Garfield, Taft and Hoover Students

October 20, 2021

Board Meeting Full meeting →
Approval of New Buildings, Modernization and Sitework Project Change Order #15 for Taft School with Beals Martin
211011 RCSD TA Bid Package G CO No. 15 Front Load Package.pdf ↗
Approval of New Buildings, Modernization and Sitework Project Change Order #1 for Taft School with Marina Mechanical
211011 RCSD TA Bid Package E CO No. 1 Frontload Package.pdf ↗

October 6, 2021

Board Meeting Full meeting →
Approval of Turnkey Security Camera and Intrusion System Agreement for Garfield, Orion Alternative (Formerly John Gill), and Taft Schools with Siemens
▶ Watch
210927 GA JG TA Security Camera and Intrusion Agreement with Siemens - Signed by Siemens.pdf ↗
Adoption of Resolution 11, Approval of New Buildings, Modernization and Sitework Project Change Order #4 and Futility Resolution for Taft School with Sanco Pipelines
▶ Watch
210621 RCSD TA Bid Package B CO No. 4 - Frontload Packet.pdf ↗210929 Taft Change Order Futility Resolution with Sanco.pdf ↗

September 22, 2021

Board Meeting Full meeting →
Approval of New Buildings, Modernization and Sitework Project Change Order #14 for Taft School with Beals Martin
▶ Watch
210909 RCSD TA Bid Package G CO No. 14 Front Load Package.pdf ↗

September 3, 2021

Special Meeting Full meeting →
Approval of Memorandum of Understanding (MOU) with Police Activities League (PAL) to Provide After School Elective Program for Students at Garfield, Taft and Hoover
PAL Agreement.pdf ↗

August 11, 2021

Board Meeting Full meeting →
Approval of Fire Alarm Conduit Painting Proposal for Taft Community School with Beals Martin
▶ Watch
210720 Taft Fire Alarm Conduit Painting Proposal with BMI - Signed by WR.pdf ↗
Approval of Construction Management (CM) Fee Amendments for Garfield, Hoover, Taft Community Schools and Orion Alternative School (Formerly John Gill) with RGM Kramer
▶ Watch
210802 Hoover CM Fee Amendment #2 with RGMK - Signed by RK and DD.pdf ↗210620 John Gill CM Fee Amendment #2 with RGMK - Fully Executed.pdf ↗210620 Taft CM Fee Amendment #3 with RGMK - Fully Executed.pdf ↗210804 Garfield CM Fee Amendment #2 with RGMK - Signed by RK and DD.pdf ↗
Approval of Special Testing and Inspection Project Authorization Form (PAF) #18-2 for Taft Community School with Ninyo and Moore
▶ Watch
210729 Taft Phase 1 Special Inspection Agreement PAF 18-2.pdf ↗
Approval of Administration Furniture Proposal for Taft Community School with RDI
▶ Watch
210727 Taft Admin Furniture Proposal with RDI - Signed by DD.pdf ↗
Approval of Library and STEAM Furniture Proposal for Taft Community School with Campbell Keller
▶ Watch
210729 Taft STEAM and Library Furniture Proposal with Campbell Keller - Signed by DD.pdf ↗
Approval of Ancillary Furniture Proposal for Taft Community School with VCO
▶ Watch
210729 Taft Ancillary Furniture Proposal with VCO - No Deposit Fully Executed.pdf ↗
Approval of New Buildings, Modernization & Sitework Project Change Order #11 for Taft Community School with Beals Martin
▶ Watch
210802 RCSD TA Bid Package G CO No. 11- Frontload Package.pdf ↗

June 30, 2021

Board Meeting Full meeting →
Approval of New Buildings, Modernization and Sitework Project Change Order #2 for Taft School with Dryco
10_2_ChangeOrder2_0.pdf ↗
Approval of New Buildings, Modernization and Sitework Project Change Order #4 for Taft School with Sanco Pipelines
10_3_ChangeOrder4_0 (1).pdf ↗
Approval of Classroom Furniture Purchase Proposal for Taft School with Virco
10_8_TaftClassroomFurniturePurchaseProposal_0.pdf ↗

June 16, 2021

Board Meeting Full meeting →
Approval of New Buildings, Modernization and Sitework Project Change Order #9 for Taft Community School with Beals Martin
10_1_ChangeOrder9_0.pdf ↗
Approval of Security Camera and Intrusion System Rough-in Proposal for Taft School with Siemens
10_11_SecurityRoughinProposalForTaftSchool_0.pdf ↗

April 14, 2021

Board Meeting Full meeting →
Approval of Special Testing and Inspection Project Authorization Form (PAF) #18-1 for Taft School with Ninyo and Moore
▶ Watch
10_5_Phase1SpecialInspectionAgreementForTaft_0.pdf ↗

March 10, 2021

Board Meeting Full meeting →
Approval of Architect Construction Administration (CA) Fee Add Service Proposals for Garfield and Taft Schools with HED
▶ Watch
10_2_AddedServicesProposalForGarfieldSchool_0.pdf ↗10_2_AddedServicesProposalForTaftSchool_0.pdf ↗
Approval of Taft Community School New Buildings, Modernization and Sitework Project Bid Package G with Beals Martin, Change Order #7
▶ Watch
10_8_ChangeOrder7_0.pdf ↗
Approval of 2020-21 Addendum to Measure U Application for Taft School
▶ Watch
13_7_AddendumToMeasureUApplicationTaft_0.pdf ↗

January 13, 2021

Board Meeting Full meeting →
Approval of Taft Community School New Buildings, Modernization and Sitework Project Bid Package G with Beals Martin, Change Order #4
▶ Watch
Resolution 11.pdf ↗

December 9, 2020

Board Meeting Full meeting →
Approval of Touchless Plumbing Fixture Replacement Construction Agreements for Garfield School, Orion Alternative (Formerly John Gill School), and Taft School with Ciari and Hoover School with Dinelli
▶ Watch
Garfield and Taft Plumbing Fixture Replacement Agreement with Ciari.pdf ↗Hoover Plumbing Fixture Replacement Agreement with Dinelli.pdf ↗Orion Alternative Plumbing Fixture Replacement Agreement with Ciari.pdf ↗
Approval of Taft Community School New Buildings, Modernization and Sitework Project Bid Package D, Change Order #1 with Dinelli Plumbing
▶ Watch
Change Order 1.pdf ↗
Approval of Addendum to 2020-21 Measure U Application for Taft Community School
▶ Watch
14_6_AddendumToMeasureUApplicationTaftSchool_0.pdf ↗

November 18, 2020

Board Meeting Full meeting →
Approval of Taft Community School New Buildings, Modernization and Sitework Project Bid Package D with Atlas/Pellizzari Electric, Change Order #3
▶ Watch
10_7_ChangeOrder3_0.pdf ↗
Approval of Taft Community School New Buildings, Modernization and Sitework Project Bid Package G with Beals Martin, Change Order #3
▶ Watch
10_8_ChangeOrder3_0.pdf ↗

November 4, 2020

Board Meeting Full meeting →
Approval of Taft Community School New Buildings, Modernization and Sitework Project Bid Package B Sanco Pipelines Change Order #2
▶ Watch
9_1_ChangeOrder2_0.pdf ↗
Approval of Agreement between the Redwood City School District and United Through Education, Inc. (Orion Alternative Mandarin Immersion, Roosevelt School, and Taft Community School)
▶ Watch
13_5_AgreementBetweenRCSDAndUnitedThroughEducationInc_0.pdf ↗

October 21, 2020

Board Meeting Full meeting →
Approval of Taft Community School New Buildings, Modernization and Sitework Project Bid Package D with Atlas/Pellizzari Electric - Change Order #2
6_3_ChangeOrder2_0 (1).pdf ↗

September 9, 2020

Board Meeting Full meeting →
Approval of Encroachment Permit Fee for Taft School with the City of Redwood City
▶ Watch
7_2_TaftEncroachmentPermitFeeProposalWithCityOfRedwoodCity_0.pdf ↗

August 26, 2020

Board Meeting Full meeting →
Approval of Taft Community School New Buildings, Modernization & Sitework Project Bid Package A Duran and Venables Change Order #2
▶ Watch
6_5_ChangeOrder2_0.pdf ↗
Approval of Covid-19 Safety Compliance Officer Proposals for Adelante Selby, Hoover, and Taft Schools with Cal Inc.
▶ Watch
6_8_ProposalForEnvironmentalConsultingServices1_0.pdf ↗6_8_ProposalForEnvironmentalConsultingServices2_0.pdf ↗
Approval of Agreement between the Redwood City School District and United Through Education, Inc. (Garfield and Taft)
▶ Watch
9_4_AgreementBetweenRCSDAndUnitedThroughEducationIncGarfield_0.pdf ↗9_4_AgreementBetweenRCSDAndUnitedThroughEducationIncTaft_0.pdf ↗

August 12, 2020

Board Meeting Full meeting →
Approval of Additional Covid-19 Safety Compliance Officer Proposal (SCO) for Adelante Selby, Hoover Community School, and Taft Community School with Cal Inc.
▶ Watch
7_2_ProposalForEnvironmentalConsultingServices_0.pdf ↗

July 29, 2020

Special Meeting Full meeting →
Approval of Taft Community School New Buildings, Modernization & Sitework Project Bid Package B Sanco Pipelines Change Order #1
▶ Watch
6_6_ChangeOrder1_0.pdf ↗
Approval of Taft Community School New Buildings, Modernization & Sitework Project Bid Package G Beals Martin Change Order #1
▶ Watch
6_7_ChangeOrder1_0.pdf ↗
Approval of Taft Community School New Buildings, Modernization & Sitework Project Bid Package A Duran and Venables Change Order #1
▶ Watch
6_8_ChangeOrder1_0.pdf ↗

June 24, 2020

Board Meeting Full meeting →
Approval of the Modernization and Site Work Project Bid, Package D, Change Order #1 for Taft Community School with Atlas/Pellizzari Electric
▶ Watch
10_3_ChangeOrder1_0.pdf ↗
Approval of New Buildings, Modernization and Site Work Project Bid Package J, Change Order #1 for Taft Community School with PARC Environmental
▶ Watch
10_4_ChangeOrder1_0.pdf ↗
Approval of Construction Management Fee Amendment #2 for Taft School with RGMK
▶ Watch
10_13_ConstructionManagementFeeAmendment_0.pdf ↗
Approval of Soil Mitigation Special Testing and Inspection Services Project Authorization Form for Taft School with Ninyo and Moore
▶ Watch
10_15_SpecialInspectionAgreement_0.pdf ↗

June 10, 2020

Board Meeting Full meeting →
Approval of Covid-19 Safety Compliance Officer Proposal at Adelante Selby School, Hoover School, and Taft School with Cal, Inc.
▶ Watch
ProposalForEnvironmentalConsultingServices.pdf ↗

April 1, 2020

Board Meeting Full meeting →
Approval of Library Moving Services with Chipman for Taft School
▶ Watch
Library Moving Services Quote.pdf ↗
Approval of Multi-Prime Construction Agreements with Various Contractors at Taft School
▶ Watch
A. Duran & Venables.pdf ↗B. Sanco Pipelines.pdf ↗C. Dryco Construction.pdf ↗D. Atlas Pellizzari.pdf ↗E. Marina Mechanical.pdf ↗F. Scapes.pdf ↗G. Beals Martin.pdf ↗H. Dinelli Plumbing.pdf ↗I. Marquee Fire Protection.pdf ↗J. PARC Environmental.pdf ↗