Draft document. Personally prepared by David Weekly; this is not a representation of the district or the Board of Trustees and may contain material factual errors. For official information, visit rcsdk8.net.
Leer en español
01

Overview

Grades
6-8
Enrollment
High-need
Chandra Leonardo
Principal
School typeNeighborhood
Community SchoolYes
Address2521 Goodwin Avenue, Redwood City, CA 94061
Phone(650) 482-2409
School websitekennedy.rcsdk8.net
GreatSchools7/10
02

Academic Performance

Student Growth

English growth
50.2%
2025-26 mid-year · District-wide: 60.7%
Math growth
51.8%
2025-26 mid-year · District-wide: 56.4%

CA State Testing (2023-24)

English Proficiency
District avg: 42%
Math Proficiency
District avg: 35%

Growth measures how much students are learning each year, regardless of their starting point. A school with low proficiency but high growth is accelerating learning. Proficiency measures how many students are at or above grade level right now.

Growth = % of students meeting their annual i-Ready Expected Growth target on the mid-year diagnostic. i-Ready is the district’s local K–8 literacy and math assessment; the LCAP goal is to raise this by 4 percentage points each year. Proficiency = % meeting or exceeding grade-level standards on the CAASPP (the California state test, given in spring of grades 3–8).

Sources: 2024-25 SARCs, 2025-26 SPSAs, 2025-26 LCAP, each school’s 2025-26 Board of Trustees data presentation. Proficiency from 2023-24 CAASPP. Growth from each school’s 2025-26 mid-year i-Ready diagnostic as reported to the Board.

03

Student Demographics

Socioeconomically Disadvantaged
Mostly students who qualify for free or low-cost school lunch
English Learners
Students still learning English
Suspension Rate
District avg: 2.2%
Students with IEPs
District avg: 17.6%
69.4%
District avg: 63%

Chronic Absenteeism by Subgroup

SubgroupRateAbsentEnrolled
All Students20.7%169818
Hispanic/Latino23.6%149631
White11.5%13113
Asian0%022
Two or More Races3%133
English Learners30.2%65215
Students with Disabilities25.9%43166
Socioeconomically Disadvantaged24.9%140562
Homeless29.5%2378

Chronic absenteeism rate by student subgroup. A student is chronically absent if they miss 10% or more of school days — about 18 days a year. Groups too small to report (fewer than 10 students) are not shown, to protect privacy. Source: California Dept. of Education, 2024-25.

English Learners: A Closer Look

In 2024-25, 208 of this school's 808 students (26%) were English Learners — students who are still learning English. Another 230 used to be English Learners and are now fluent: they passed the state's English test and were "reclassified" (RFEP).

Learning English
208
26% of the school
Long-Term (LTEL)
80
6+ years as an English Learner
At Risk of LTEL
7
4-5 years as an English Learner
Now Fluent (RFEP)
230
Tested out of English Learner status

A "long-term English Learner" (LTEL) is a student who has been learning English for 6 or more years without yet reaching fluency; students at 4-5 years are counted as "at risk" of becoming long-term. Schools watch these numbers because the goal is for students to reach fluency well before the 6-year mark.

Source: California Dept. of Education English Learner data (ELAS/LTEL), 2024-25 school year.

04

Funding

Total Per Pupil
$20,277 iSARC 2024-25
District: $19,914 + community: $363
Est. School Cost
$16.0M iSARC 2024-25
Restricted: $8,175 · Unrestricted: $11,739
Avg Teacher Salary
$92,378 iSARC 2024-25
District: $95,778
PTO/PTA Per Pupil
$363

Per-pupil expenditure data from the 2022-23 SARC. Restricted funds include Title I, special ed, and EL programs. Unrestricted funds are general operating. PTO/PTA revenue from IRS Form 990 filings.

Site Supplemental (SPSA) 2025-26

Supplemental (SPSA)
SPSA Per Pupil

SPSA Source Breakdown

Title I: $76K District: $159K PTO/PTA: $20K Measure U: $192K Prop 28: $117K
Source Amount % of Total
Title I $76K 13%
District $159K 28%
PTO/PTA $20K 4%
Measure U $192K 34%
Prop 28 $117K 21%
Total $563K 100%

This school receives Title I federal funding.

SPSA budgets represent supplemental site-level spending (enrichment, counseling, PD, materials). Base operating costs (teacher salaries, admin, facilities) come from the general fund and vary by school.

05

Who Teaches Here

John F. Kennedy Middle School has 42 teachers for 808 students — about 20 students per teacher. On average, its teachers have been teaching for 11.8 years, and 7 of the 42 are in their first or second year.

Teachers
42
Students per Teacher
19.7:1
District avg: 21:1
Avg Years Teaching
11.8
10.3 years in RCSD
New Teachers
7 / 42
In their 1st or 2nd year of teaching
Students per Counselor
404:1
Counselors, psychologists, social workers & nurses

Source: California Dept. of Education staffing data, 2024-25 school year.

Credentials

Fully Credentialed
District avg: 75%
Misassigned
EL Misassigned

"Misassigned" means a teacher was placed in a class they are not credentialed for — most often classes with students learning English (EL). District target: 100% by 2027.

A stark gap inside the school on the state English test: 81% of White students meet grade level vs. 38% of Hispanic students and 4% of students learning English. More teachers have left here over the last 3 years than at any other school (20 departures). Largest teaching staff in the district (30 evaluated teachers).

Teacher Race & Ethnicity

Race/EthnicityTeachers%Share
Hispanic/Latino1023.8%
White2047.6%
Asian511.9%
African American24.8%
Filipino49.5%
Pacific Islander12.4%
Total42100%

Counts classroom teachers only. Source: California Dept. of Education staff data, 2024-25 school year.

06

Documents & Resources

School Accountability Report Card (SARC)

A yearly report card the state requires from every school: test scores, class sizes, teacher credentials, and campus conditions in one PDF.

Download SARC (PDF) ↗

School Plan for Student Achievement (SPSA)

The school’s yearly plan for how it spends its extra (“supplemental”) money — tutoring, counselors, materials, and more.

Download SPSA (PDF) ↗

Board Presentation

2025-26 · April 22, 2026

View presentation (PDF) ↗

Bell Schedule

Grade RegularMon · Tue · Wed · Fri Thursday
6-8 8:30 AM3:15 PM 1:50 PM

Lunch Menu

View menu ↗

Parent Communication

ParentSquare (district-wide) ↗

Report an Absence

SchoolMessenger

iOS ↗ · Android ↗

Comprehensive Safety Plan

2025-26 plan, board-approved Feb 4, 2026.

Download CSSP (PDF) ↗

School Site Council

Chair: Aravind Somanchi

SPSA adopted: May 7, 2025

Principal: Chandra Leonardo
Teacher: Jennifer Virnich, Endre Balogh
Staff: Shanna Laney, Cynthia Cardona, Katie Robles
Parent / Community: Christina Codemo, Steve Osborn, Jessica Bryski, Christina Codemo, Arvind Somanchi, Jim Smith, Irma Zoepf, Whitney Glockner-Black

View SPSA ↗

07

Board Meetings

Board of Trustees meetings with agenda items mentioning this school.

June 17, 2026

Regular Full meeting →
Approval of Additional Scope of Work for DG Path and Mow Curbs Change Order #4 for Kennedy Middle School #2 with Holt Renewables, LLC.
260617 RCSD Kennedy MS2 CO#4 - DG Path & Additional Scope REV1 ↗

May 27, 2026

Regular Full meeting →
Approval of the Agreements for Special Inspection and Testing Services with Applied Materials and Engineering for the HVAC Upgrade projects Phase 2 at Clifford, Orion, and Kennedy Schools
▶ Watch
Clifford Special Inspection _ Testing Agreement sig AME_ ↗Orion Special Inspection _ Testing Agreement sig AME_ ↗Kennedy Special Inspection _ Testing Agreement sig AME_ ↗
Approval of the Agreements for Commissioning Services with Cypress Engineering Group for the HVAC Upgrade projects Phase 2 at Clifford, Orion, and Kennedy Schools
▶ Watch
Orion CX Agreement sig Cypress ↗Kennedy CX Agreement sig Cypress ↗Clifford CX Agreement sig Cypress ↗
Approval of the Agreements for DSA Inspection Services with MWC Associates for the HVAC Upgrade projects Phase 2 at Clifford, Orion, and Kennedy
▶ Watch
Orion IOR Agreement sig MWC ↗Kennedy IOR Agreement sig MWC ↗Clifford IOR Agreement sig MWC ↗

May 13, 2026

Regular Full meeting →
Approval of the Agreement for Atlas Pellizzari Electric for the amount of $70,520 to Install the PowerFlex Electric Vehicle Chargers at Adelante Selby, Clifford, and Kennedy Schools
▶ Watch
Atlas EV Charger Replacement_Agreement for Construction Services-Small Projects (SD) - rev Nov 2022(3968000.1).docx ↗

April 22, 2026

Regular Full meeting →
Approval of Guaranteed Maximum Price (GMP) Amendment 1 to Facilities Lease with Blach Construction for the HVAC Upgrade projects, Phase 2 at Clifford School, Orion School, and Kennedy Middle School
▶ Watch
Original Facilities_Lease_-_HVAC_Upgrades_Projects_-_Increment_2_(Blach)(4533164.1).docx ↗GMP Amendment to Facilities Lease - HVAC Upgrades Project, Incrmt 2 - Signed (Blach) ↗
Kennedy Middle School Presentation and School Plan for Student Achievement (SPSA) Approval
▶ Watch
Kennedy SPSA 2025-26_(Spring)_John_F._Kennedy_Middle_School_20260415 (1) ↗Kennedy 25-26 Data for Board presentation ↗

April 1, 2026

Regular Full meeting →
Approval of Kennedy’s Field Trip Request to the Grand Canyon from May 13th through 22nd, 2026
▶ Watch
25-26 Kennedy. Grand Canyon ↗

February 4, 2026

Regular Full meeting →
Adoption of Resolution No. 16, Lease-Leaseback Agreement with Blach Construction for HVAC Projects, Phase 2 at Clifford School, Orion School, and Kennedy Middle School
▶ Watch
Res 16 Supporting LLB Award (HVAC Upgrades PH 2 - Blach_ rev 01.27.2026)(4533797.1) ↗Facilities Lease - HVAC Upgrades Projects - Increment 2 (Blach)(4533164.1) ↗Site Lease - HVAC Upgrades Projects - Increment 2 (Blach)(4533153.1) ↗LLB Contract Documents - HVAC Upgrades Projects - Increment 2 (Blach)(4533156.1) ↗Facilities Lease - Exhibit C - HVAC Upgrades Projects - Increment 2 (Blach)(4533165.1) ↗Facilities Lease - Exhibit D - HVAC Upgrades Projects - Increment 2 (Blach)(4533163.1) ↗Facilities Lease - Exhibit D-1 - HVAC Upgrades Projects - Increment 2 (Blach)(4533157.1) ↗
Approval of Overtime Allowance, Change Order #3 for Solar Phase 2 Project at Kennedy Middle School #2 with Holt Renewables
▶ Watch
260204 RCSD Kennedy MS2 CO#3 - OT Allowance ↗
Approval of the Addendum to the Measure U Application for Kennedy Middle School for the 2025-2026 School Year
▶ Watch
2025-26 Kennedy Measure U Addendum Signed ↗

January 21, 2026

Regular Full meeting →
Approval of the Agreement for Atlas Pellizzari Electric for the amount of $70,520 to Install the PowerFlex Electric Vehicle Chargers at Adelante Selby, Clifford, and Kennedy Schools
▶ Watch
Atlas EV Charger Replacement_Agreement-Small Projects (SD) - rev Nov 2022(3968000.1) ↗

September 10, 2025

Regular Full meeting →
Approval of the Pre-Construction Services Agreement with Siemens Building Management Systems for the Phase II HVAC Upgrades Projects at Kennedy MS, Orion, and Clifford
▶ Watch
Siemens_Contract_080824 ↗RCSD Phase 2 HVAC Upgrades Precon v2 ↗
Approval of Contracts with Quattrocchi Kwok Architects (QKA) for Design Services for HVAC Upgrades Projects at Kennedy Middle , Orion Alternative, and Clifford schools
▶ Watch
Redwood City SD-Quattrocchi - Architect Agreement - Kennedy (DWK Aug-19-25) ↗Redwood City SD-Quattrocchi - Architect Agreement - Orion (DWK Aug-19-25) ↗Redwood City SD-Quattrocchi - Architect Agreement - Clifford (DWK Aug-19-25) ↗

August 27, 2025

Regular Full meeting →
Approval of Kennedy Middle School Field Trip to Yosemite – October 19 - 24, 2025
▶ Watch
25-26 Kennedy.Yosemite (Updated 2025.08.26) ↗

June 25, 2025

Regular Full meeting →
Approval of HVAC Upgrade Projects Phase II: Kennedy Middle School, Orion Alternative School, and Clifford School
▶ Watch

May 28, 2025

Board Meeting Full meeting →
Approval of Kennedy’s Field Trip Request to Italy, June 7, 2025, through June 16, 2025
▶ Watch
Kennedy-Field Trip Request Form_Italy-June 7-17, 2025.pdf ↗
School Plan for Student Achievement (SPSA review)
▶ Watch
Hoover SPSA 2025-26_Spring)__20250518.pdf ↗Kennedy SPSA 2025-26_(Spring)__20250519.pdf ↗MCKinley Middle School SPSA ↗North Star Academy 2025-26_SPSA(Spring)__20250514.pdf ↗Roy Cloud SPSA 2025-26_20250514.pdf ↗

February 5, 2025

Board Meeting Full meeting →
Board updated Measure U spending plan.
▶ Watch
2024-25 Kennedy Measure U Addendum_signed.pdf ↗

December 6, 2023

Board Meeting Full meeting →
Kennedy and McKinley School Presentations for 2023-2024 School Year
▶ Watch
Kennedy Board Report 2023.pdf ↗MIT Board Report 2023.pdf ↗

November 8, 2023

Board Meeting Full meeting →
Approval of Addendum to 2023-24 Measure U Application for Kennedy Middle School
Kennedy Measure U Addendum No. 1.pdf ↗

May 24, 2023

Board Meeting Full meeting →
Approval of Proposal for Cabinets and Sink Replacement with Beals Martin for Kennedy Middle School
▶ Watch
230524 Kennedy STEAM Cabinet and Sink Replacement with Beals Martin - Signed by MC.pdf ↗
Approval of Proposal for STEAM Rover Tables with Campbell Keller for Kennedy Middle School
▶ Watch
230524 Kennedy Maker's Space Rover Tables - Signed by MC.pdf ↗

March 8, 2023

Board Meeting Full meeting →
Presentations on School Plans for Student Achievement: McKinley Institute of Technology (MIT) and Kennedy Middle School
▶ Watch
Kennedy SPSA Board Report .pdf ↗MIT SPSA Board Report.pdf ↗
Addendum to 2022-23 Measure U Application for Kennedy Middle School
▶ Watch
Kennedy Measure U ADDENDUM 2022-23.pdf ↗

January 18, 2023

Board Meeting Full meeting →
Approval of Proposal for Mobile Robotics Tables with Campbell Keller for Kennedy Middle School
▶ Watch
221214 Kennedy Maker's Space Robotics Tables Proposal with Campbell Keller - Signed by MC.pdf ↗

November 16, 2022

Board Meeting Full meeting →
Approval of Proposal for Panic Gates and Bike Rack Fence with Dryco for Kennedy Middle School
▶ Watch
New Panic Gates and Bike Rack Fence Proposal - Kennedy.pdf ↗

September 7, 2022

Board Meeting Full meeting →
Approval of Project Inspector Agreement Amendment #12 with Inspectacon at Kennedy Middle School's Maker Space Project, Orion Alternative School (Formerly John Gill School), and McKinley Institute of Technology's Theater Projection Screen
▶ Watch
220907 RCSD Project Inspector Amendment #12 with Inspectacon.pdf ↗

August 10, 2022

Board Meeting Full meeting →
Adoption of Futility Resolution 3, Approval of Maker Space Project Change Order #2 with Castillo Plumbing & Construction at Kennedy Middle School
▶ Watch
220810 RCSD JFK Maker Space CO No. 2 Front Load Package.pdf ↗220810 Kennedy Change Order Futility Resolution #3 with Castillo.pdf ↗

April 27, 2022

Board Meeting Full meeting →
Approval of New Garden Proposal at Kennedy Middle School with Scapes
▶ Watch
220406 Kennedy Garden Proposal with Scapes - Signed by DD.pdf ↗

December 15, 2021

Board Meeting Full meeting →
Approval of Architect Additional Services Proposals for Garfield, Kennedy, and Taft Schools with HED
▶ Watch
211202 Kennedy Maker Space Misc Services Proposal with HED - Signed by DD.pdf ↗211202 Garfield Off-Site Coordination Proposal with HED - Signed by DD.pdf ↗211202 Garfield Additional CA Proposal with HED - Signed by DD.pdf ↗211202 Taft Additional CA Proposal with HED - Signed by DD.pdf ↗

December 8, 2021

Board Meeting Full meeting →
Approval of Maker Space Construction Agreement with Castillo Plumbing for Kennedy Middle School
▶ Watch
211118 RCSD JFK Castillo Plumbing-Construction Agreement - signed.pdf ↗

October 6, 2021

Board Meeting Full meeting →
Approval of Maker Space Window Replacement Proposal for Kennedy Middle School with Golden Bay Glass
▶ Watch
210923 Kennedy Maker Space Window Replacement Proposal with Golden Bay - Signed by DD.pdf ↗

September 22, 2021

Board Meeting Full meeting →
Approval of Soil Off Haul Proposal for Kennedy Middle School with O'Grady
▶ Watch
210825 Kennedy Parking Lot Expansion Soil Off Haul Proposal with O'Grady - Signed by WR.pdf ↗

August 25, 2021

Board Meeting Full meeting →
Approval of Maker's Space Furniture Proposal for Kennedy Middle School with Campbell Keller
210817 Kennedy Maker's Space Furniture Proposal with Campbell Keller - Signed by DD.pdf ↗

August 11, 2021

Board Meeting Full meeting →
Approval of Parking Lot Expansion Project Change Order #1 for Kennedy Middle School with O’Grady Paving
▶ Watch
210802 RCSD JFK Parking Lot Expansion CO No.1- Frontload Package.pdf ↗

June 30, 2021

Board Meeting Full meeting →
Approval of Maker's Space Design Proposal for Kennedy Middle School and Boiler Replacement Design Proposal for Garfield School with HED
10_6_GarfieldBoilerReplacementDesign_0.pdf ↗10_6_KennedyMakersSpaceDesignProposal_0.pdf ↗

June 16, 2021

Board Meeting Full meeting →
Kennedy Middle School’s Advanced Band Performance, “The Mandalorian”

May 19, 2021

Board Meeting Full meeting →
Approval of Parking Lot Expansion Construction Agreement for Kennedy Middle School with O'Grady Paving
▶ Watch
11_8_AgreementForParkingLotExpansion_0.pdf ↗

May 5, 2021

Board Meeting Full meeting →
Approval of Agreement for Additional Mental Health Therapist at Kennedy Middle School with Effective School Solutions (ESS) Program
▶ Watch
13_4_ESSFirstAmendment_0.pdf ↗13_4_ESSOriginalAgreement_0.pdf ↗13_4_ESSSecondAmendment_0.pdf ↗

April 14, 2021

Board Meeting Full meeting →
Approval of the Proposal to Refresh the Track for Kennedy Middle School with Scapes
▶ Watch
10_7_TrackRefreshProposalForKennedy_0.pdf ↗
Approval of Parking Lot Expansion Architect Agreement for Kennedy Middle School with HED
▶ Watch
10_18_ParkingLotExpansionArchitectAgreementForKennedy_0.pdf ↗

March 24, 2021

Board Meeting Full meeting →
Approval of Addendum to 2020-21 Measure U Application for Kennedy Middle School
▶ Watch
10_3_202021AddendumToApplicationForUseOfMeasureUFunds_0.pdf ↗

January 13, 2021

Board Meeting Full meeting →
Kennedy Middle School Art Show
▶ Watch
Approval of Kennedy Middle School Modernization Project with Cal-Pacific Construction, Change Order #6
▶ Watch

November 18, 2020

Board Meeting Full meeting →
Approval of Kennedy Middle School Modernization Project with Cal-Pacific Construction, Change Order #5
▶ Watch
10_11_ChangeOrder5_0.pdf ↗
Approval of Interim Housing Electrical Disconnect Proposal for Kennedy Middle School with Fusion Electric
▶ Watch
10_18_InterimHousingElectricalDisconnectProposal_0.pdf ↗

November 4, 2020

Board Meeting Full meeting →
Approval of Interim Housing Removal Asphalt Repair Proposals for Henry Ford School and Kennedy Middle School with Dryco
▶ Watch
9_8_AdditionalAsphaltReplacementKennedy_0.pdf ↗9_8_RampAsphaltReplacementProposalHenryFord_0.pdf ↗9_8_RampAsphaltReplacementProposalKennedy_0.pdf ↗

October 21, 2020

Board Meeting Full meeting →
Approval of Touchless Plumbing Fixture Replacement Construction Agreement for Kennedy Middle School with Milestone Contractors
6_11_AgreementForPlumbingFixtureReplacementProject_0.pdf ↗

September 23, 2020

Board Meeting Full meeting →
Approval of Kennedy Middle School Modernization Project Cal-Pacific Construction Change Order #4
▶ Watch
10_2_ChangeOrder4_0.pdf ↗

September 9, 2020

Board Meeting Full meeting →
Approval of Final Plan and Field Review Invoice for Kennedy Middle School Administration and Parking Lot Project with the Division of the State Architect (DSA)
▶ Watch
7_5_AdminAndParkingDSAFinalInvoice_0.pdf ↗

July 29, 2020

Special Meeting Full meeting →
Approval of Kennedy School Modernization Project Cal-Pacific Construction Change Order #3
▶ Watch
6_9_ChangeOrder3_0.pdf ↗

June 24, 2020

Board Meeting Full meeting →
Approval of Additional Covid-19 Safety Compliance Officer Proposal for 2950 Fair Oaks Site, Henry Ford School, and Kennedy Middle School with The Safety Guys
▶ Watch
10_7_Covid19SCOAddendumB_0.pdf ↗

June 10, 2020

Board Meeting Full meeting →
Approval of Covid-19 Safety Compliance Officer Proposal at 2950 Fair Oaks Site, Henry Ford School, and Kennedy School with The Safety Guys
▶ Watch
SafetyComplianceOfficerProposal.pdf ↗
Approval of Modernization Project, Change Order #2 at Kennedy Middle School with Cal-Pacific Construction
▶ Watch
ChangeOrder2.pdf ↗

May 20, 2020

Board Meeting Full meeting →
Approval of Administration Building and Parking Lot Project Change Order #8 with Beals Martin for Kennedy Middle School
▶ Watch
11_3_ChangeOrder8_0.pdf ↗

April 22, 2020

Board Meeting Full meeting →
Approval of Administration Building and Parking Lot Project Change Order #7 with Beals Martin for Kennedy Middle School
▶ Watch
9_1_ChangeOrder7_0.pdf ↗
Approval of Modernization Project Change Order #1 with Cal-Pacific Construction for Kennedy Middle School
▶ Watch
9_4_ChangeOrder1_0.pdf ↗