Draft document. Personally prepared by David Weekly; this is not a representation of the district or the Board of Trustees and may contain material factual errors. For official information, visit rcsdk8.net.
Leer en español
01

Overview

Grades
TK-8
Enrollment
High-need
Kristy Jackson
Principal
School typeNeighborhood
Address225 Clifford Avenue, Redwood City, CA 94062
Phone(650) 482-2402
School websiteclifford.rcsdk8.net
GreatSchools7/10
02

Academic Performance

Student Growth

English growth
62.8%
2025-26 mid-year · District-wide: 60.7%
Math growth
50.3%
2025-26 mid-year · District-wide: 56.4%

CA State Testing (2023-24)

English Proficiency
District avg: 42%
Math Proficiency
District avg: 35%

Growth measures how much students are learning each year, regardless of their starting point. A school with low proficiency but high growth is accelerating learning. Proficiency measures how many students are at or above grade level right now.

Growth = % of students meeting their annual i-Ready Expected Growth target on the mid-year diagnostic. i-Ready is the district’s local K–8 literacy and math assessment; the LCAP goal is to raise this by 4 percentage points each year. Proficiency = % meeting or exceeding grade-level standards on the CAASPP (the California state test, given in spring of grades 3–8).

Sources: 2024-25 SARCs, 2025-26 SPSAs, 2025-26 LCAP, each school’s 2025-26 Board of Trustees data presentation. Proficiency from 2023-24 CAASPP. Growth from each school’s 2025-26 mid-year i-Ready diagnostic as reported to the Board.

03

Student Demographics

Socioeconomically Disadvantaged
Mostly students who qualify for free or low-cost school lunch
English Learners
Students still learning English
Suspension Rate
District avg: 2.2%
Students with IEPs
District avg: 17.6%
47.1%
District avg: 63%

Chronic Absenteeism by Subgroup

SubgroupRateAbsentEnrolled
All Students19.1%138721
Hispanic/Latino26.8%88328
White10.6%28264
Asian18.2%633
Two or More Races14.3%963
English Learners26%39150
Students with Disabilities24.1%39162
Socioeconomically Disadvantaged28.2%103365
Homeless23.3%730

Chronic absenteeism rate by student subgroup. A student is chronically absent if they miss 10% or more of school days — about 18 days a year. Groups too small to report (fewer than 10 students) are not shown, to protect privacy. Source: California Dept. of Education, 2024-25.

English Learners: A Closer Look

In 2024-25, 143 of this school's 698 students (20%) were English Learners — students who are still learning English. Another 64 used to be English Learners and are now fluent: they passed the state's English test and were "reclassified" (RFEP).

Learning English
143
20% of the school
Long-Term (LTEL)
19
6+ years as an English Learner
At Risk of LTEL
12
4-5 years as an English Learner
Now Fluent (RFEP)
64
Tested out of English Learner status

A "long-term English Learner" (LTEL) is a student who has been learning English for 6 or more years without yet reaching fluency; students at 4-5 years are counted as "at risk" of becoming long-term. Schools watch these numbers because the goal is for students to reach fluency well before the 6-year mark.

Source: California Dept. of Education English Learner data (ELAS/LTEL), 2024-25 school year.

04

Funding

Total Per Pupil
$18,453 iSARC 2024-25
District: $18,184 + community: $269
Est. School Cost
$12.3M iSARC 2024-25
Restricted: $8,194 · Unrestricted: $9,990
Avg Teacher Salary
$97,033 iSARC 2024-25
District: $95,778
PTO/PTA Per Pupil
$269

Per-pupil expenditure data from the 2022-23 SARC. Restricted funds include Title I, special ed, and EL programs. Unrestricted funds are general operating. PTO/PTA revenue from IRS Form 990 filings.

Site Supplemental (SPSA) 2025-26

Supplemental (SPSA)
SPSA Per Pupil
$1,001 iSPSA 2025-26

SPSA Source Breakdown

Title I: $73K District: $129K PTO/PTA: $196K Measure U: $173K Prop 28: $93K
Source Amount % of Total
Title I $73K 11%
District $129K 19%
PTO/PTA $196K 29%
Measure U $173K 26%
Prop 28 $93K 14%
Total $665K 100%

This school receives Title I federal funding.

SPSA budgets represent supplemental site-level spending (enrichment, counseling, PD, materials). Base operating costs (teacher salaries, admin, facilities) come from the general fund and vary by school.

05

Who Teaches Here

Clifford School has 34 teachers for 698 students — about 21 students per teacher. On average, its teachers have been teaching for 13 years, and 9 of the 34 are in their first or second year.

Teachers
34
Students per Teacher
20.8:1
District avg: 21:1
Avg Years Teaching
13
10.8 years in RCSD
New Teachers
9 / 34
In their 1st or 2nd year of teaching
Students per Counselor
465.3:1
Counselors, psychologists, social workers & nurses

Source: California Dept. of Education staffing data, 2024-25 school year.

Credentials

Fully Credentialed
District avg: 75%
Misassigned

"Misassigned" means a teacher was placed in a class they are not credentialed for — most often classes with students learning English (EL). District target: 100% by 2027.

Teacher demographics highlights

White staff75%

Parents raise the second-largest PTO total in the district ($196K, after North Star). A serious challenge: none (0%) of its long-term English Learners — students learning English for 6+ years — are at grade level. The share of White teachers has been rising (75%, up 8.3 points over 4 years).

Teacher Race & Ethnicity

Race/EthnicityTeachers%Share
Hispanic/Latino38.8%
White2367.6%
Asian411.8%
Filipino411.8%
Total34100%

Counts classroom teachers only. Source: California Dept. of Education staff data, 2024-25 school year.

06

Documents & Resources

School Accountability Report Card (SARC)

A yearly report card the state requires from every school: test scores, class sizes, teacher credentials, and campus conditions in one PDF.

Download SARC (PDF) ↗

School Plan for Student Achievement (SPSA)

The school’s yearly plan for how it spends its extra (“supplemental”) money — tutoring, counselors, materials, and more.

Download SPSA (PDF) ↗

Board Presentation

2025-26 · April 1, 2026

View presentation (PDF) ↗

Bell Schedule

Grade RegularMon · Tue · Wed · Fri Thursday Super-min
TK 8:20 AM1:20 PM 12:35 PM 11:45 AM
K 8:15 AM2:05 PM 1:15 PM 11:45 AM
1-3 8:15 AM2:30 PM 1:30 PM 11:45 AM
4-8 8:15 AM2:40 PM 1:35 PM 11:45 AM

Lunch Menu

View menu ↗

PTO / PTA

Clifford School Parents Club ↗

Delinquency notice on file with CA Registry

Parent Communication

ParentSquare (district-wide) ↗

Konstella — Likely uses Konstella — check cliffordschoolpto.org/helpful-links to confirm

Report an Absence

SchoolMessenger

iOS ↗ · Android ↗

Comprehensive Safety Plan

2025-26 plan, board-approved Feb 4, 2026.

Download CSSP (PDF) ↗

School Site Council

Chair: Dione Smith

SPSA adopted: April 18, 2025

Principal: Kristy Jackson
Teacher: Jennifer Overbey, Dione Smith, Marianne Chance, Shannon Cody
Staff: Casey Nosky, Julie Harrison
Parent / Community: Katie McNally, Alex Chalmer, Jennifer Erskine, Alana Ballon, Susie Crowell, Jennifer Toller, Scarlett Mineta

View SPSA ↗

07

Board Meetings

Board of Trustees meetings with agenda items mentioning this school.

May 27, 2026

Regular Full meeting →
Approval of the Agreements for Special Inspection and Testing Services with Applied Materials and Engineering for the HVAC Upgrade projects Phase 2 at Clifford, Orion, and Kennedy Schools
▶ Watch
Clifford Special Inspection _ Testing Agreement sig AME_ ↗Orion Special Inspection _ Testing Agreement sig AME_ ↗Kennedy Special Inspection _ Testing Agreement sig AME_ ↗
Approval of the Agreements for Commissioning Services with Cypress Engineering Group for the HVAC Upgrade projects Phase 2 at Clifford, Orion, and Kennedy Schools
▶ Watch
Orion CX Agreement sig Cypress ↗Kennedy CX Agreement sig Cypress ↗Clifford CX Agreement sig Cypress ↗
Approval of the Agreements for DSA Inspection Services with MWC Associates for the HVAC Upgrade projects Phase 2 at Clifford, Orion, and Kennedy
▶ Watch
Orion IOR Agreement sig MWC ↗Kennedy IOR Agreement sig MWC ↗Clifford IOR Agreement sig MWC ↗

May 13, 2026

Regular Full meeting →
Approval of the Agreement for Atlas Pellizzari Electric for the amount of $70,520 to Install the PowerFlex Electric Vehicle Chargers at Adelante Selby, Clifford, and Kennedy Schools
▶ Watch
Atlas EV Charger Replacement_Agreement for Construction Services-Small Projects (SD) - rev Nov 2022(3968000.1).docx ↗

April 22, 2026

Regular Full meeting →
Approval of Guaranteed Maximum Price (GMP) Amendment 1 to Facilities Lease with Blach Construction for the HVAC Upgrade projects, Phase 2 at Clifford School, Orion School, and Kennedy Middle School
▶ Watch
Original Facilities_Lease_-_HVAC_Upgrades_Projects_-_Increment_2_(Blach)(4533164.1).docx ↗GMP Amendment to Facilities Lease - HVAC Upgrades Project, Incrmt 2 - Signed (Blach) ↗

April 1, 2026

Regular Full meeting →
Clifford School Presentation and School Plan for Student Achievement (SPSA) Approval
▶ Watch
Clifford 2025-26_SPSA (Spring)_Clifford_Elementary_School_20260320 ↗Clifford 25-26 Data for Board presentation ↗

February 4, 2026

Regular Full meeting →
Adoption of Resolution No. 16, Lease-Leaseback Agreement with Blach Construction for HVAC Projects, Phase 2 at Clifford School, Orion School, and Kennedy Middle School
▶ Watch
Res 16 Supporting LLB Award (HVAC Upgrades PH 2 - Blach_ rev 01.27.2026)(4533797.1) ↗Facilities Lease - HVAC Upgrades Projects - Increment 2 (Blach)(4533164.1) ↗Site Lease - HVAC Upgrades Projects - Increment 2 (Blach)(4533153.1) ↗LLB Contract Documents - HVAC Upgrades Projects - Increment 2 (Blach)(4533156.1) ↗Facilities Lease - Exhibit C - HVAC Upgrades Projects - Increment 2 (Blach)(4533165.1) ↗Facilities Lease - Exhibit D - HVAC Upgrades Projects - Increment 2 (Blach)(4533163.1) ↗Facilities Lease - Exhibit D-1 - HVAC Upgrades Projects - Increment 2 (Blach)(4533157.1) ↗

January 21, 2026

Regular Full meeting →
Approval of the Agreement for Atlas Pellizzari Electric for the amount of $70,520 to Install the PowerFlex Electric Vehicle Chargers at Adelante Selby, Clifford, and Kennedy Schools
▶ Watch
Atlas EV Charger Replacement_Agreement-Small Projects (SD) - rev Nov 2022(3968000.1) ↗

January 14, 2026

Regular Full meeting →
Approval of the Addendum to the Measure U Application for Clifford School for the 2025-2026 School Year
▶ Watch
2025-26 Clifford School Measure U Addendum No. 1 ↗

September 10, 2025

Regular Full meeting →
Approval of the Pre-Construction Services Agreement with Siemens Building Management Systems for the Phase II HVAC Upgrades Projects at Kennedy MS, Orion, and Clifford
▶ Watch
Siemens_Contract_080824 ↗RCSD Phase 2 HVAC Upgrades Precon v2 ↗
Approval of Contracts with Quattrocchi Kwok Architects (QKA) for Design Services for HVAC Upgrades Projects at Kennedy Middle , Orion Alternative, and Clifford schools
▶ Watch
Redwood City SD-Quattrocchi - Architect Agreement - Kennedy (DWK Aug-19-25) ↗Redwood City SD-Quattrocchi - Architect Agreement - Orion (DWK Aug-19-25) ↗Redwood City SD-Quattrocchi - Architect Agreement - Clifford (DWK Aug-19-25) ↗

June 25, 2025

Regular Full meeting →
Approval of HVAC Upgrade Projects Phase II: Kennedy Middle School, Orion Alternative School, and Clifford School
▶ Watch

May 14, 2025

Board Meeting Full meeting →
School Plan for Student Achievement (SPSA review)
▶ Watch
Adelante Selby Sp. . SPSA(Spring)_20250506.pdf ↗Roosevelt SPSA 2025-26_(Spring)__20250506.pdf ↗Clifford SPSA 2025-26_(Spring)__20250506.pdf ↗

March 26, 2025

Board Meeting Full meeting →
Annual school presentation to the Board
▶ Watch
Clifford 24-25 Data for Board presentation [Updated 2025.03.25].pdf ↗

January 8, 2025

Board Meeting Full meeting →
Board updated Measure U spending plan.
▶ Watch
2024-25 Clifford Measure U Addendum [2025.01.08].pdf ↗

June 5, 2024

Board Meeting Full meeting →
Board Title I school-wide program designation.
▶ Watch

May 10, 2024

Retreat (Offsite) Full meeting →
Board held closed session on district property lease negotiations.

April 17, 2024

Board Meeting Full meeting →
Board updated Measure U spending plan.
▶ Watch
Clifford Measure U Addendum No. 2.pdf ↗

January 17, 2024

Board Meeting Full meeting →
Clifford and North Star School Presentations for the 2023-2024 School Year
Clifford Board Report 2024.pdf ↗NSA Board Report 2024.pdf ↗

November 8, 2023

Board Meeting Full meeting →
Approval of Addendum to 2023-24 Measure U Application for Clifford Community School
CLIFFORD Measure U Addendum No. 1.pdf ↗

April 19, 2023

Board Meeting Full meeting →
Report on School Plans for Student Achievement: Roosevelt and Clifford Schools
▶ Watch
Roosevelt SPSA Board Report (1).pdf ↗Clifford SPSA Board Report .pdf ↗

November 9, 2022

Board Meeting Full meeting →
Approval of Addendum to 2022-23 Measure U Application for Clifford School
▶ Watch
Clifford Addendum Measure U 2022-23.pdf ↗

October 12, 2022

Board Meeting Full meeting →
Approval of Proposal for Gate Buzzer and Intercom with Siemens Industry, Inc. at Clifford School and McKinley Institute of Technology
▶ Watch
220906 MIT Intercom and CL Gate Buzzer Proposal with Siemens - Signed by MC.pdf ↗

June 29, 2022

Board Meeting Full meeting →
Approval of Covered Walkway Spread Footing Change Order Proposal for Clifford School with Park Planet
▶ Watch
220608 Clifford Covered Walkway Spread Footing CO #1 with Park Planet - Signed by DD.pdf ↗

March 23, 2022

Board Meeting Full meeting →
Approval of Agreement between Redwood City School District and San Mateo County Sheriff's Activities League (SAL) to Provide Extra Curricular Programs for Students at Garfield, Clifford and Hoover
▶ Watch
SAL agreement board 3.24.22.pdf ↗

January 12, 2022

Board Meeting Full meeting →
Approval of Addendum to 2021-22 Measure U Application for Clifford School
▶ Watch
CLIFFORD Measure U Addendum 2021-22.pdf ↗

December 15, 2021

Board Meeting Full meeting →
Approval of Kinder/TK Play Structure Construction Agreements for Clifford and Adelante Selby Schools with Park Planet
▶ Watch
211208 Selby Kinder-TK Play Structure Construction Agreement with Park Planet.PDF ↗211208 Clifford Kinder-TK Play Structure Construction Agreement with Park Planet.PDF ↗

December 8, 2021

Board Meeting Full meeting →
Approval of Covered Walkway Construction Agreement with Park Planet for Clifford School
▶ Watch
211119 Clifford Covered Walkway Construction Agreement with Park Planet - Signed by PP.pdf ↗

November 17, 2021

Board Meeting Full meeting →
Approval of an Additional Mental Health Therapist with Effective School Solutions at Clifford School for 2021-22
▶ Watch
ESS 21-22 Contract.pdf ↗Effective School Solutions Appendix A.pdf ↗ESS Second Amendment_21.22.pdf ↗ESS First Amendment 21-22.pdf ↗

October 6, 2021

Board Meeting Full meeting →
Approval of Administration Building Turf and Pavers Proposal for Clifford School with Scapes
▶ Watch
210921 Clifford Artifical Turf and Pavers Proposal with Scapes - Signed by DD.pdf ↗

August 11, 2021

Board Meeting Full meeting →
Approval of Lighting Bollards Proposal for Clifford School with Atlas Pellizzari
▶ Watch
210730 Clifford Lighting Bollards Proposal with Atlas - Signed by DD.pdf ↗

June 23, 2021

Board Meeting Full meeting →
City Trees Project at Clifford School
Approval of School District Requested Construction Services Proposal for Clifford School with Cumiskey
7_5_SchoolDistrictRequestedAddProposal_0.pdf ↗

June 16, 2021

Board Meeting Full meeting →
Approval of Multi-Use Building (MUB) Backup Generator Construction Agreements for Clifford School with Various Trade Contractors
10_7_BackupConcreteConstructionAgreementWithCaseyFogli_0.pdf ↗10_7_BackupGeneratorElectricalConstructionAgreementWithAtlasPellizzari_0.pd ↗10_7_BackupGeneratorPlumbingConstructionAgreementWithOCMcDonald_0.pdf ↗

May 19, 2021

Board Meeting Full meeting →
Approval of Backup Generator Purchase Proposal for Clifford, Hoover, and Roy Cloud School with Bayside
▶ Watch
11_7_GeneratorPurchaseProposalClifford_0.pdf ↗11_7_GeneratorPurchaseProposalHoover_0.pdf ↗11_7_GeneratorPurchaseProposalRoyCloud_0.pdf ↗

May 5, 2021

Board Meeting Full meeting →
Approval of Modernization Project for Clifford School with Cumiskey Construction, Change Order #2
▶ Watch

April 14, 2021

Board Meeting Full meeting →
Approval of Asphalt Replacement Construction Agreement for Clifford School with Silicon Valley Paving
▶ Watch
10_10_AsphaltReplacementAgreementForClifford_0.pdf ↗
Approval of Exterior Ramp Proposal for Clifford School with Ap and Deck
▶ Watch
10_12_RampsForBuildingsAAndBProposalForClifford_0.pdf ↗
Approval of American Disability Act (ADA) Path of Travel and Handrail Proposals for Clifford School with Dryco
▶ Watch
10_15_ADAHandrailsProposalForClifford_0.pdf ↗10_15_PathOfTravelUpgradesProposalForClifford_0.pdf ↗

March 10, 2021

Board Meeting Full meeting →
Scholastic Bloom Hybrid Plant Projects (7th and 8th Grade Science at Clifford School)
▶ Watch
9_1_7thGradeScholasticHybridPlantContest_0.pdf ↗

February 10, 2021

Board Meeting Full meeting →
Virtual Winter Concert (Clifford School, McKinley Institute of Technology and North Star Academy)
▶ Watch
Approval of Picnic Table Purchase and Installation Proposal for Clifford School with Park Planet
▶ Watch
10_4_PicnicTableInstallationProposal_0.pdf ↗
Approval of Addendum to 2020-21 Measure U Application for Clifford School
▶ Watch
13_4_MeasureUAddendumForCliffordSchool_0.pdf ↗

January 27, 2021

Board Meeting Full meeting →
Approval of Perimeter Fencing Proposal for Clifford School with Dryco
▶ Watch
10_3_PerimeterFencingProposal_0.pdf ↗

November 18, 2020

Board Meeting Full meeting →
Approval of Clifford Elementary School Modernization Project with Cumiskey Construction, Change Order #1
▶ Watch
Approval of Asphalt Replacement Design Project Authorization Form for Clifford School with Kier and Wright
▶ Watch
10_16_ProjectAuthorizationForm_0.pdf ↗
Approval of Backup Power Design Agreement for Multi-Use Buildings (MUB) at Clifford and Roy Cloud Schools and Food Storage at Hoover School with HED
▶ Watch
10_20_MasterArchitectAgreement_0.pdf ↗
Approval of Touchless Plumbing Fixture Replacement Construction Agreement for Clifford and Henry Ford School with NV Heathorn
▶ Watch
10_21_PlumbingFixtureAgreement_0.pdf ↗
Approval of Extension of Effective School Solutions (ESS) Program Contract for Clifford School and McKinley Institute of Technology
▶ Watch
13_5_ESSAmendedContract_0.pdf ↗13_5_ESSOriginalContract_0.pdf ↗

August 12, 2020

Board Meeting Full meeting →
Approval of Special Testing and Inspection Project Authorization Form (PAF) for Clifford School with Ninyo and Moore
▶ Watch
7_4_SpecialInspectionAgreement_0.pdf ↗

June 24, 2020

Board Meeting Full meeting →
Approval of the Covid-19 Safety Compliance Officer Proposal for Clifford School, Garfield School, Roy Cloud School, and Roosevelt School with The Safety Guys
▶ Watch
10_10_SCOProposal_0.pdf ↗
Approval of Clifford School Modernization Construction Agreement
▶ Watch
10_19_ModernizationConstructionAgreement_0.pdf ↗

May 6, 2020

Board Meeting Full meeting →
Approval of New Fencing Enclosures and Concrete Fix Proposal with Dryco for McKinley School, Clifford School, and District Office
9_1_ProposalContractForNewFencingEnclosures_0.pdf ↗

April 1, 2020

Board Meeting Full meeting →
Approval of Additional Legacy Closeout Support Proposal with WLC Architects at Clifford School
▶ Watch
Additional Services Authorization.pdf ↗